Task 1 :- Create Ether Channel
Task 2 :- Configure Static DTP
Task 3 :- Configure SW3 Primary and SW2 Secondary
Task 4 :- Configure VTP SW1 server and all client
Task 5 :- Create VLAN 11,12,21,22 and 123 and assign ports
Task 6 :- Create SVI
Task 7 :- Configure DHCP and Redundancy DHCP Server
Task 8 :- Configure Routing between Switch and Router
Task 9 :- Configure HSRP
Task 10 :- ping 8.8.8.8